← BPSD6030 tutorial tools
Colour theme

Put an HVAC System Together

Every HVAC system is a chain of parts that carries heat between the rooms and the outdoors. Here you build systems from those parts on a section through a building. Drag a part from the tray into an empty slot, or select the part and then the slot. A part in the wrong place goes back to the tray with the reason.

Where this fits in the Week 9 tutorial
  • Before the session → tabs 1 Follow the heat and 2 Inside the air-handling unit
  • Step 4, Schematic conventions → tab 3 What reaches the zone: build the case closest to your candidate system
  • Step 5, Air path → tab 4 Trace the air, then trace the air on a typical floor of your own building
  • After the session, before the IOA → tab 5 Spot the fault

Steps 1, 2, 3 and 6 use no tab: Sanity-check the input, Test the candidate system, Scale and size, and Plant room and riser sketch.

Build a central cooling system, then follow the heat out of the building.

An office like this one is cooled by four loops in a chain. Air collects heat in the rooms and gives it up at a cooling coil. Chilled water carries it to the chiller. Refrigerant inside the chiller lifts it to a higher temperature. Condenser water carries it to the cooling tower, which throws it away. Nothing in the chain makes cold. Eight parts are missing from the drawing, and each loop lights up once all its parts are in. Some parts in the tray belong to other systems. Heating here is an electric element at each VAV box, so there are no heating-water pipes.

Parts