← All units BPSD6030

Building Systems

Interactive planning aids for the BPSD6030 tutorials, arranged by week. They complement the DesignBuilder work: use them to structure the design reasoning behind Assignments 1 and 2. DesignBuilder remains the tool for loads and energy; validate every decision against your own model.

Choose an HVAC SystemWeek 5

Walk your building through fresh-air, heating/cooling, system, and plant choices across the Australian commercial HVAC families. See the system drawn as a schematic, read how each part works, and reason through its carbon and a low-carbon pathway to justify in Assignment 2.